Kingwood Underground
the heart and soul of our Kingwood, Texas family
Login - Create Account - Help
Clean out your garage on Kingwood bookoo! Or find local garage sales on Yard Sale Search.com
KU Live!

Home Generator Installation

who's talking here?

marthas attic 1
ukchristine 1
Perfection 3
justcat 3
Cookin' Queen 1
partsguy 5
tinman 2
freebyrd 3
truthmiser 1
Grumpy 1
Q The Rain in 5 4 3 2 2
LiveFreeOrDie 1
Circlesmile 1
Voknows 1
nooneishome 1

     » send to friend     » save in my favorites     » flag dangerous topic flag as a dangerous topic

partsguy --- 15 years ago -

Looking for referrals and what others have paid for home generator installations. Generac 20kw is what I need.

First estimate from Cruz seemed excessive at $11,200.

What can you fine folks tell me? 

justcat --- 15 years ago -

Well,the unit itself can run form 4,000 to 15,000..avg...so, with installation..that does not seem too out of line. 

justcat --- 15 years ago -

That unit you mention runs around 5,000. 

Perfection --- 15 years ago -

So is that wired in to your house and switch on in emergencies? 

Perfection --- 15 years ago -

And how much of your house would that allow you to use? 

partsguy --- 15 years ago -

You are right, the generator itself and the ATS (automatic transfer switch) is right at $5,000. What shocked me was the $6,200 installation price. Nothing exotic. Clear area for placement 6' from the electrical box. The gas line is 75' away so I know that would add $800-$1,000 onto the price, but still - $5,200 to pour a 3x4 slab, hook up the electrical, and hook up the gas.... I may be wrong but it seemed high. I was expecting to pay around $9,000 total. Still hoping.

This generator covers the entire house. 

justcat --- 15 years ago -

Yeah,my Dad has one at the Lake House..Would love to have one here...
He has had his about 5 years.. 

Q The Rain in 5 4 3 2 --- 15 years ago -

My friend had her gas line put for her whole house generator while her house was being built. That alone was $1200. 

Q The Rain in 5 4 3 2 --- 15 years ago -

We had a friend wire our regular generator to run the house current. (with the main off) Parts for that was just $150. Of course, now that we have the hook-up we'll never have to use it. (one can only hope!) 

Perfection --- 15 years ago -

Where is it secured so it isn't stolen? 

marthas attic (Mod) --- 15 years ago -

when my dad looked into that years ago, he was looking at 10 - 12 grand. 

LiveFreeOrDie --- 15 years ago -

Where is it secured so it isn't stolen? 

Usually a slab is poured and the gen is bolted to the slab. somewhere close to the breaker box. 

tinman --- 15 years ago -

Partsguy...

PM Freebyrd. They got one a year or two before Ike hit and they were down right popular for the two weeks afterward...lol.

She'll be able to tell you who they used.

When Rita came blowing through, I went and bought 10 20kw generators through Carrier. I am a commercial a/c guy. I put them on a trailer and drove to Beaumont and met up with an electrician friend of mine. I was selling the units right off of the trailer for 2400.00. I paid 1200.00 a piece for them. The electrician charged them like 500-750 per house to hook them up and they had to call a plumber for the natural gas.

I'm guessing the homeowners got it all installed for around 4k.

Looks like I was selling them too cheaply....lol.

When I got back to Houston that afternoon, I went straight to the supply house and they were sold out already. 

Cookin' Queen --- 15 years ago -

Know a friend that had one install for medical issues with his mom. Didn't last a long time and was unrepairable. Must have been made in China. 

Grumpy --- 15 years ago -

I have a 20Kw Generac on order with Generator Superstores in Tomball. Turnkey with auto transfer & surge suppressor, 2 years maintenance, turn key $13K. 

nooneishome --- 15 years ago -

For that much I'd start setting up a solar power system. 

freebyrd --- 15 years ago -

Figure looks pretty accurate. PM me if you would like more detail. Would definitely do it again! 

partsguy --- 15 years ago -

WOW! I just cannot get over someone charging $4,000+ for an installation. I know I can buy the generator and ATS for $5,000 myself from Northern Tool, or a number of places. I can pour my own foundation. I would think that I could contract out the electrical install to an electrician, and the gas install to a plumber. Hopefully one of the remaining bids will be better. If I can get under $10,000 I am fine with it. When the install costs more than the product I get a little weird about that cost. Smells greedy. We shall see. 

freebyrd --- 15 years ago -

That gas line is a serious expense and as far as the electrical goes, all I know is that it MUST be done 'right' so as not to injure others or their property when it automatically kicks on at the onset of a regular electric service interruption. 

partsguy --- 15 years ago -

Here is part of the problem! I had Quality Generators come out and give me a bid. Very good company, lots of BBB awards which they are rightfully very proud of. After the selling shpeel from the rep we get down to pricing, and they are $2,000 HIGHER than anyone else. When we get into the details of the bid I find out that they add the following to every bid no matter what.

$350 for something called a 5-2-1 that supposedly helps my a/c compressor start smoother (didn't ask for it, don't need it).

$395 for a 1-year maintenance agreement (didn't ask for it, don't need it).

$1,495 for a 10-year warranty thru Quality Generator (didn't ask for it, don't want it).

That is $2,240 in additional costs that I didn't ask for. When I tell the rep I don't need or want those, he tells me "they are built into every quote and cannot be removed".

When I told him that isn't right, and sounds unethical he again told me it is standard practice. I would have given them the job without those add-ons.

I am going to see if someone from Quality calls me back on Monday to discuss this practice. If not, I guess I will be their first BBB complaint on their business practices. We shall see. 

tinman --- 15 years ago -

The 5-2-1 is a different kind of capacitor that we use to help the compressor at startup. Great product.

Most folks don't know that the instant a compressor flashes on, the in rush amperage requirements are well over 800.

The reason your main breaker doesn't trip is because of the capacitor. Your outdoor unit already has one. The one that was part of your generator proposal is a much better one. It's part of your proposal as a protective measure against your generator suffering damage due to your current capacitor not working properly.

You might get away with not paying for the other extras, but I would definitely recommend you not skimp on the hard start capacitor.

As for the BBB, I would slow your roll just a little. The BBB is going to tell you that they have no control over pricing issues. Just shady business practices. Since you sniffed out the extra charges, it's hard to see how you were harmed by this company.

Since there's nothing to mediate here, the BBB is going to thank you for your time and move on. They will not put a black mark against a company unless the complaint is legit and the investigation and mediation point to an impasse.

There's nothing here to mediate. 

Circlesmile --- 15 years ago -

Welcome to Kingwood partsguy. I often find crooks offering sevices for your home\auto around here. I guess many dont read the fine print in what they are charged. Thats why those people do it. Chargeing for services not regurding a job.. Keep looking Houston is a big town and the expence of generators go down in winter just like a/c's. 

ukchristine --- 15 years ago -

I think a lot of this type of work is expensive around here and often wonder if the "Kingwood" factor is part of the high charges. I guess it could be worse...we could be in River Oaks. Somehow Kingwood has a reputation of being the high rolller area. I don't understand that especially if some of these homes were in other parts of the country they would be in the cheep part of town! 

Voknows --- 15 years ago -

15k gen, plus slab, switchgear et.. installed should be under 3500.00 or less, and everyone makes a beautiful profit. I feel sorry for single women and elderly that get duped by these f----n crooks. 

truthmiser --- 15 years ago -

Have you checked out Centerpoint's rebate program on this? link

Another consideration when having a NG 15-20 KW gen installed is what the current NG service to your home is. Your NG service has to be able to deliver sufficient fuel depending on the load you plan on running in emergency generator mode.

Example
Fuel Requirements
Fuel System 14KW 20KW
Fuel types Natural Gas or LP Vapor
Fuel supply inlet 1/2 NPT
Fuel supply pressure, kPa (in. H2O):
Natural gas 1.2--2.7 (5-11)
LP 1.7--2.7 (7-11)
Fuel flow rates, Btu/hr.
Natural gas 193,000 281,000
LP 203,000 340,000

Fuel Consumption
Fuel Consumption, m3/hr. (cfh)
Fuel Type % Load 14RESL 20RESL
Natural Gas
100% 5.4 (193) 8.0 281
75% 4.7 (163) 6.9 243
50% 3.5 (124) 4.6 161
25% 2.6 (93) 3.6 127
LP Vapor
100% 2.3 (81) 3.9 136
75% 2.1 (75) 3.1 109
50% 1.8 (60) 2.3 82
25% 1.2 (45) 1.7 59
LP vapor conversion factors:
8.58 ft.3 = 1 lb.
0.535 m3 = 1 kg
36.39 ft.3 = 1 gal.
Nominal fuel rating:
Natural gas: 37 MJ/m3 (1000 Btu/ft.3)
LP vapor: 93 MJ/m3 (2500 Btu/ft.3) 

partsguy --- 15 years ago -

Tinman, great information. If it was put to me that way I would have agreed right away, Thanks. I am aware of the NG requirements. In fact one change is for an upgraded regulator that will flow more gas. No problem there. my frustration was the built in warranty and maintenance agreement (pure profit makers). No problem if it was explained up front but that only came out after asking for detail pricing.

I understand everyone has to make a profit and that they aren't making much on the generator itself. With the generator being $5k, the gas line install another $1k for a hard cost of $6,000; I don't mind that someone charges another $4,000 for one days labor of electrician and plumber. Huge profit for them. I can live with $10,000 for the total package. But now $12,000 with the extra $2,000 baked in.

If anyone knows of a generator vendor that wants a $10,000 sale, HERE I AM!!! 

freebyrd --- 15 years ago -

My people can get with your people tomorrow... if interested, send a pm. 

page 1
Login to add your comments!

see more discussions about...


Online now:
hit counters

Terms of Service - Privacy Policy - Ice Box

Kingwood Underground